Discover Cabeceiras de BastoFree independent guide
ViveCabeceirasYOUR GUIDE TO CABECEIRAS
ENEnglish
SearchSaved
Abadim · intervention in Peio in 2017

Wood, stone and coir on the banks of the Peio

At Ranha, restoring the river also meant choosing materials.

Reading options

At Ranha, the riverbank tells a story of construction too. The work inaugurated on 17 June 2017 combined stone, wood, coir and native plants. According to the municipal news report, it aimed to stabilise the Peio’s banks, restore riverside vegetation and ecologically rehabilitate the leisure area in Abadim.

The work extended to supporting facilities: parking, the building and toilets, the bridge and the road’s retaining wall. Work on the river belonged to a wider project bringing landscape and public use together.

The municipality linked the project to compensation and mitigation measures associated with the Daivões dam, with financial support from Iberdrola. This helps explain the work’s context beyond its visible materials. The report documents 2017; it does not establish that facilities operate today or that the water is suitable for bathing. Consult practical information in Ranha’s place profile.

Explore further: words and activities
Explore this story

Taking care of the margins in many ways

Open an option and choose the story.

  1. The vegetation between water and landThe river also has a forest →
  2. Selective care with another streamClearing a stream is also knowing what is →
  3. What comes to the river from the landThe river begins before the bank →
Compare documented interventions and ecological relationships.
See Fact sheet: Zona de Banhos da Ranha
Source and context

Municipality — inauguration of the renaturalization of Peio margins, news of 20/06/2017

Accessed: . Editorial summary; the date of consultation is not the date of the facts.

More ways to explore
Follow a path with this story
YOUR LOCAL GUIDE

What would you like to discover?

Take a closer look.