The wires connecting town and hills
Choose the first story or read the full route. Steps keep the suggested order and sources.
The wires connecting town and hills4 stories · about 3 min reading
A power station, plans for the villages and the work of putting cables under the streets.
- Travel through timeA power station for three municipalitiesAt Cefra, the waters of the rio de Ouro tied electricity generation to the history of three municipalities.Read this story
- Travel through timeA network drawn in place namesA notice from 1978 shows how the electricity network for Rio Douro and Refojos was planned.Read this story
- Travel through timeTaking electricity to the villagesA deadline published in 1980 shows how an expansion of the grid brought together places in three parishes at the time.Read this story
- Travel through timeWhen power cables went under the streetIn 2012, work between Quinchoso and Ponte de Pé changed what people saw above the street.Read this story