Samão · Festa das Papas, January 2017

When a house made way for a square

Residents and local representatives gathered in the new square in Samão.
Opening of a new square in Samão on the day of the Festa das Papas, 20 January 2017.
ⓘ

Opening of a new square in Samão on the day of the Festa das Papas, 20 January 2017.

Source: Municipality of Cabeceiras de Basto

View source

Date given at source: .

Autoria individual e licença de reutilização não indicadas na fonte municipal.

Request removal or correct the photo credit

In Samão, the opening took place on a day when people were already out in the village streets.

In 2014 the Municipality bought an empty house in Samão. The idea was to make room amid narrow streets and closely spaced houses. The former house made way for space for vehicles to turn and for a table and benches where people could sit and talk.

The square opened on 20 January 2017, during the Festa das Papas. The celebration in honour of Saint Sebastian alternates between Samão and Gondiães. The photograph shows how a small public works project became part of a major day in the village calendar.

Getting to know the parish
Source and context

Municipality, new square in Samão, January 2017

Accessed: . Editorial summary; the date of consultation is not the date of the facts.

Back to index ↑
Gondiães · the former school, 2017

The old school opened a new door

People gathered beside the entrance and plaque of the former Gondiães school.
Opening by the entrance of the former Gondiães school, August 2017.
ⓘ

Opening by the entrance of the former Gondiães school, August 2017.

Source: Municipality of Cabeceiras de Basto

View source

Date given at source: .

Autoria individual e licença de reutilização não indicadas na fonte municipal.

Request removal or correct the photo credit

People gathered by a plaque on the stone wall of the former school.
Opening of the community hall in the former Gondiães school, 11 November 2017.
ⓘ

Opening of the community hall in the former Gondiães school, 11 November 2017.

Source: Municipality of Cabeceiras de Basto

View source

Date given at source: .

Autoria individual e licença de reutilização não indicadas na fonte municipal.

Request removal or correct the photo credit

A photograph from Gondiães records a moment when part of the school returned to village use.

The parish council and the Gondiães commons acquired the former primary school. The building was then made available to the Associação Dinamizadora dos Interesses de Gondiães, which began restoring and enlarging it.

Part of the ground floor became a chapel of rest, opened on 26 August 2017. In the photograph published by the municipality, people gather by the stone entrance. The image records a project involving the association, the parish, the commons and the municipality.

The project had a second opening on 11 November. A multipurpose hall opened and another room became available. The association said it planned to evoke the old classroom there and establish its headquarters. The two photographs show separate moments in the same transformation.

Getting to know the parish
Source and context

Municipality — opening at the former Gondiães school

Municipality, opening of the Gondiães community hall, November 2017

Accessed: . Editorial summary; the date of consultation is not the date of the facts.

Back to index ↑
Cunhas · public works in 2018 and 2019

What changed at the Cunhas water tank?

The structure of the water tank and its outer cladding.
Cunhas water tank in the photograph published by the Municipality in September 2019.
ⓘ

Cunhas water tank in the photograph published by the Municipality in September 2019.

Source: Municipality of Cabeceiras de Basto

View source

Photograph date not stated.

Autoria individual e licença de reutilização não indicadas na fonte municipal.

Request removal or correct the photo credit

A photograph published in 2019 helps tell the less visible side of a village water supply.

In 2018 work was carried out on the treatment of the Cunhas water supply. The following year work reached the water tank itself. The municipal report mentions protection and cladding on the exterior, improved ventilation and work on the building’s equipment.

The tank is one part of the journey water makes. Between the intake and the tap are pipes and treatment equipment as well. The report also announced work for 2020, with no completion recorded in this publication.

Getting to know the parish
Source and context

Municipality, works on the Cunhas water tank, September 2019

Accessed: . Editorial summary; the date of consultation is not the date of the facts.

Back to index ↑
Alvite e Passos · Valcôvo, 2019

An upgraded power network in Valcôvo

A technician beside electrical equipment installed in Valcôvo.
New transformer commissioned in Valcôvo, Petimão, on 26 August 2019.
ⓘ

New transformer commissioned in Valcôvo, Petimão, on 26 August 2019.

Source: Municipality of Cabeceiras de Basto

View source

Date given at source: .

Autoria individual e licença de reutilização não indicadas na fonte municipal.

Request removal or correct the photo credit

The history of electricity also includes small projects that improve existing networks.

A new transformer was commissioned in Valcôvo, in Petimão, on 26 August 2019. The area already had electricity. The project answered complaints about the quality of the supply and included upgrades to the low-voltage lines.

The municipal report estimated that the new installation would serve around twelve points of use. That number gives a sense of scale: a handful of connections can show how a network is gradually adapted to the way a place is lived in.

Getting to know the parish
Source and context

Municipality, upgrade to the power network in Valcôvo, August 2019