Keeping a bridge is also making history Vive Cabeceiras · Cavez · conservação do património, 2018–2019 Not all changes in a monument can be seen at first sight. In 30 April 2019, the Municipality announced the completion of the works at Ponte de Cavez initiated in October 2018 by the Infrastructures of Portugal. The intervention reinforced the foundations of the pillars and treated the board: pavement, waterproofing, body guard and drainage. The bridge, classified as National Monument since 1910, thus continued to receive care long after its construction. This report documents that work; it does not evaluate the current state of the structure. The announcement distinguishes two parts of an intervention: the support of the bridge, through the foundations of the pillars, and the surface of passage, with pavement, waterproofing and drainage. The painting of the body guard was only a portion of the work. A general photograph shows the bridge in the landscape, but not enough to document the reinforcement made in the foundations. Compare this news with the chronology: the nineteenth-century enlargement and the 2018–2019 endeavor are distinct interventions. Maintaining a monument also produces new documentation, which must maintain the date and scope of the work described. Sources and context Municipality — conclusion of rehabilitation of Ponte de Cavez, 30/04/2019 https://cabeceirasdebasto.pt/index.php?oid=20702&op=all Accessed: 2026-11-07 Editorial summary. The date of consultation is not the date of the facts. Text and recipe, when available. Photos, activities and updates on the page: https://vivecabeceiras.pt/en/descobrir/terra-viva/?leitura=cavez-conservar2019#cavez-conservar2019